Week Two
Friday, March 31st, 2006
The weather cooperated and we got a full week in on the posts in the pool. To make sure we got the batter correct, we focused on the two deepest posts. Once they are all the same height, it will be easier to work them up together and see the balance of stones and the batter of the columns.
This is where we were at the start of the day on Monday. Note the icy, muddy pool. Sun and sump pumps to the rescue.

Here are posts one and two at the end of the day on Friday. Post one is entirely above water level.

Here’s post three. This particular column breaks into three sections to get around the deck structure, making for some difficult fits.